Project Engineer

Nov 2018 - Jan 2020

  • Led the development of user controls such as gear levers, window switches, media controls, and overhead consoles.

  • Managed client change orders, assessing their technical feasibility, cost implications, and development timelines.

  • Ensured controls met requirements for perceived quality and user experience.

  • Handled client feedback and managed iteration cycles to ensure products met their requirements and expectations.

  • Visited Kostal’s Shanghai office and production plant to collaborate with development and production engineers.

  • Had continuous alignments with software, hardware, and design engineers to ensure products met client specifications.

Tools and Methodologies: CDB (PLM software), CATIA V5, Production Part Approval Process (PPAP), Design Failure Mode and Effect Analysis (DFMEA), Process Failure Mode and Effects Analysis (PFMEA), Excel

Previous
Previous

Volvo Cars

Next
Next

Polestar